Design Build/Design Assist
Healthcare
Industrial
Government
Education
Scaffolding

Education

University of Iowa Carver Hawkeye Arena



Location
: Iowa City, Iowa
General Contractor: Knutson Construction
Architect: Neumann Monson
Engineer: KJWW
Ryan took the lead for all BIM coordination on he addition and renovation to Carver Hawkeye Arena, as well as installing all the mechanical and plumbing systems. The addition was 100,000 sq. ft. and the renovation segment of the product included space for team facilities, strength training and meeting rooms for 16 separate sports programs.


St. Ambrose University Center for Health Sciences



Location
: Davenport, Iowa
General Contractor: Estes Construction
Architect: SGGM/HBA
Engineer: Ryan &Associates
Estes Construction selected Ryan for plumbing and HVAC services for this state-of-the-art academic building that includes mock nursing stations  in addition to other lab facilities on the Genesis West Campus. The facility utilizes a storm water retention system to lessen storm water issues in the area. “Green” methods were utilized on the HVAC and plumbing systems through a 97% efficient boiler, Aaon unit for fresh air makeup, fluid cooler and R410A heat pumps. The domestic water is heated using the boiler through a heat exchanger. High efficient urinals and toilets were also installed.